Current Feature Projects

  1. Caltrans I80 Gilman Interchange Project

75 million – April 2022 to July 2022

Project Description – It involves the construction of a steel arch suspension bridge over I80 for pedestrians and bicyclists, and the reconfigurations of street traffics from convergence of frontage roads, freeway ramps, and Gilman Street.  The suspension pedestrian overcrossing consists of east and west reinforced concrete box girder ramps, and the middle portion consisting of two post-tensioned edge beams and intermediate reinforced concrete floor beams at hangar points connected by hangar cables to the two steel arch ribs anchored to two elliptical bent caps on both sides.

Job Title : Structure Representative

Responsibilities: 1. Computed soffit and deck grades for the east and west ramps. 2. Computed hangar elevations for the cable hangar inserts in the first concrete pour. 3.  Responded to RFIs. 4. Authorized structures submittals.  5. Managed 2 field inspectors.  6. Coordinated and inspected mitigation for 2 CIDH piles with issues of blocked inspection tubes from dropped rebar cages and casings.

2. San Diego City West Mission Bay Bridge

Scroll to Top