Yuba River Side Hills Viaducts, Route 49, Downieville, CA

$14 million – April 2021 –  Sep 2021

Project Description: The project involves construction of 4 viaducts 280 to 320 feet long, comprising 2 frames and 7 to 9 spans with middle hinges.  They are built as 20-foot widening to existing roadway with complicated horizontal and vertical curves. They consist of 20-inch reinforced slabs on grade supported by 24 inch CIDH piles with 4-foot galvanized pin rebar cage at top of piles.  Rebar reinforcements are predominantly epoxy-coated and the deck is treated with methacrylate and waterproofing materials and overlain with hot mix asphalt concrete and fog seal.

Job Title: Assistant Structure Representative and Roadway Inspector

Responsibilities include: 1. Computing finish grades for abutments, hinges, top and bottom of slabs, pile cutoff and top of pin. 2. Computing and verifying on site the rebar cage lengths of CIDH piles. 3. Witnessing testing of rebar couplers for deck slabs and concrete barriers. 4. Measuring and recording in as-built plans the types and locations of all rebar couplers in deck slabs and concrete barriers. 5. Maintaining the CIDH pile logs, recording start, finish and progress of installation in addition to installation problems including depths of water intrusion, location and depth of caving, slurry backfill and re-drill, grout leakage into river, signs of insufficient dewatering causing contamination of concrete with mud sludge. 6. Measuring and agreeing with contractor field measured quantities immediately after the completion of the item work, and this is accomplished with signed agreement with contractor and documentation in diaries. 7. Writing diaries, maintaining concrete pour records and documentation for material release tags, and preparing as-built plans. 8. Inspecting installation of construction area signs and temporary striping and signal light systems, and temporary roadway widening with hot mixed asphalt concrete; layout and construction of CIDH piles, abutments and hinges, bent caps and deck slabs, including rebars and concrete pours; methacrylate deck treatment and installation of waterproofing seal and membrane; installation of polyester joint seal dams; hot mix asphalt concrete paving and fog sealing; installation of concrete barrier and bicycle railing; installation of Type B joint seal; pavement grinding and punch list work; drainage culverts and headwalls.

 

I5 South Widening from Oso to Alicia Parkway,  Mission Viejo, CA.

$190 million – May 2020 –  Sep 2020

Project Description: It includes three bridge widenings and two bridge replacements, 19 retaining walls and 36 overhead sign structures.

Job Title: Assistant Structure Representatives

Responsibilities include: 1. Reviewing submittals for demolition plans, excavation and shoring plans using slope stability analyses, shop drawings for metal decking, MSE walls and precast concrete girders, CIDH pile mitigation plans and concrete mix designs. 2. Conducting calculations for camber strips, abutment elevations and verifying contract compliance of soil nail test results. 3. Inspecting construction and test of soil nail walls, CIDH pile mitigation using pressure grouting, and retaining wall construction.

Caltrans Empire Project,  Burbank, CA.

$250 million – May 2015 –  Apr 2019

Project Description: It includes four Bridge Widening and one new bridge, retaining walls, sound walls, MSE walls for Freeway 5 widening, with total project cost at $250 million.

Job Title: Assistant Structure Representative

Responsibilities include: Performing full time field engineering inspection for CIDH piles of retaining wall, sound wall, and abutment for Bridge widening; Field inspection for MSE wall; Working on Contract Change Order; Performing construction control survey

***********************************************************************************

OCTA SR91 WB Widening, Anaheim, CA.

$70 million –Mar 2013 to Mar 2016

Project Description: This project costs $70 million. It consists the construction of 6 bridge widenings of steel and precast girders, and numerous retaining walls and sound walls.

Job Title: Principal Assistant to Structure Represenative

Responsibilities include:
1. Review and approve all structures submittals including excavation and shoring plans, falsework plan, sign structure shop drawings, precast and steel girder shop drawings, bearing pads shop drawings, concrete mix design, ground anchor shop drawings, CIDH installation plans, demolition plans and column guying plans.
2. Compute and check abutment and bent pour grades such as bearing seat elevations, and retaining weep hole elevations.
3. Compute and check abutment and bent pour grades such as bearing seat elevations, and retaining weep hole elevations.

*********************************************************************************

La Conchita Project, Carpinteria, CA

$53 million – Jun 2012 to Feb 2015

Project Description: Project costing $55 million and consisting of a bridge widening, several retaining walls, a pedestrian undercrossing , a bike ramp and a pedestrian ramp.

Job Title: Structure Representative

Responsibilities include:
1. Perform engineering inspections during all phases of construction including bridges, walls, barriers, drainage structures, and sign structures.

*********************************************************************************

Route 73 Tieback Wall, Laguna Niguel, CA

$12 million – Sep 2012 – Nov 2012

Project Description: This project costs about $12 million, involving construction of 208 units of 4 foot diameter cast-in-drilled hole (CIDH) concrete piles at 6-foot spacing, with shear pile wall about 1000 ft long , and the total number of tieback ground anchors installed in between the piles reaches 322. This reason for this project is because embankment slip is detected below the existing Mechanically Stabilized Earth (MSE) walls, and the CIDH piles with tieback anchors extending beyond the slip are proposed as an engineering solution to stabilize the slip circle.

Job Title: Structure Inspector .

Responsibilities include:  Inspected ground anchors and shear pile wall.

***********************************************************************************

I5-170 Interchange Project, Pacoima, CA

$110 million – Jul 2011 – Jan 2012

Project Description: The project consists of 2 new connectors namely 717 m, 11 span N170-N5 Connector and 251m, 7 span 5-170 HOV Connector; 5 major bridge widenings; 5,000 meters of retaining walls and sound walls; 55 overhead sign structures.

Job Title: Assistant Structure Representative

Responsibilities include:
1. Reviewing shop drawings for prestressing, joint seal assemblies, soundwalls, sign structures and permanaent metal decking; 2. Providing calculation of deck dowel grades and soffit grades; 3. Inspecting prestressing, Austin vaults, sound walls, retaining walls, culvert modifications, CIDH piles, rebars and concrete placement, PTFE bearings, deck and stem and soffit pours, concrete barriers, falsework.

*********************************************************************************

Route 110-10 HOV Project, Los Angeles, CA

$20 million – Jul 2011 to Feb 2013

Project Description: The project consists of Olympic Blvd UC (Widen), Eleventh Street UC (Widen), S110-W10 Connector Viaduct (Widen), Ninth St UC (Widen), W10/S110 Connector UC, Ninth Street Offramp Separation (East) (Replace), RW 349, RW 351, RW 200, RW 1, RW 2, SW 21, SW 353, and SW 355.

Job Title: Assistant Structure Representative

Responsibilities include:

  1. Inspection of bridges; retaining walls; structural excavation and structural backfill; l
  2. Laised with Caltrans designers to resolve construction and utility
  3. Inspected construction of shoring, falsework, pre-cast girders, pre-stressing, CIDH piles, bridge widening, 2 phase offramp bridge
  4. Resolved issues and design discrepancies;
  5. Maintained project files.

*********************************************************************************

I 580 WB Widening, Livermore, CA

$40 million – Nov 2012 to Feb 2014

Project Description: This contract costs 40 million dollars involving 2 major bridges widening (1 widening of Precast‐Prestressed Girders Bridge and 3 widening of Slab bridges), 4 retaining walls, 1 soil nail wall, 13 sign structures, widening freeway and payment rehabilitation. The structure items cost is $4 million.

Job Title: Assistant Structure Representative

Responsibilities include:

1. Review submittals on concrete mix designs, bridge demolition plan, and overhead sign structure CIDH placement plan.

2. Assist in reviewing submittals on column guying plan, precast‐prestressed girders placement plan, temporary shoring plan, soil nail assembly, overhead sign structure shop drawing, precast pile shop drawing and false work erection and removal plan

3. Review retaining wall and bridge widening project plans for constructability

4. Daily field inspection on bridges and retaining walls operations

5. Calculate monthly pay estimate quantity

6.Perform profilograph, evaluate profiles and grinding for bridge deck

7. Prepare as‐built plans and final punch list

8. Profile top of retaining wall elevation to generate weep hole elevations, pavement elevations and top of wall elevations.

9. Survey existing bridge decks and generate 4 scale drawing for bridge widening construction.

************************************************************************

Route 405 Widening, Culver City, CA

$17 million – Mar 2013 to May 2014

Project Description: This project involves construction of 400mm to 2100mm diameter cast-in-drilled hole (CIDH), wet and dry piles. (2) bridge widenings and (3) retaining walls on piles and spread footing. Prestressing cast-in-place bridges. Installation of isolation casing and column casing.

Job Title: Assistant Structure Representative

Responsibilities include:

1. Inspection and documentation for CIDH drilling,

2. Inspection of prestressing system;

3. Inspection of column casings installation and painting;

4. Inspection of isolation casing installation;

5. Inspection of temporary support and jacking;

6 Inspection of rebar placement and concrete pour.

7. Assisting structure rep with submittal review and progress pay estimates.

**********************************************************************************

Overhead Sign Structures, Oakland, CA

$25 million – Mar 2012 to May 2014

Project Description: The project, costing $25 million, consists of the construction of many overhead sign structures on Hwy 80 from Oakland to Rodeo. The overhead truss spans vary from 100ft to 140 ft. CIDH concrete pile has been used for the foundation. Due to high level of ground water and soil caving potential, the slurry displacement method with temporary steel casing have been used to build the foundation. The diameter of CIDH piles on the shoulder is 5 ft, and the depth of the pile is 63 ft, typically. Due to high volume of traffic on Hwy 80, the allowable time for the lane closure is very constraint, also construction safety, scheduling, drilling methods to handle the ground water and soil caving are other critical factors.

Job Title: Structure Representative

Responsibilities include:
1. Perform engineering inspections during all phases of construction including bridges, retaining walls, barriers, drainage structures, and sign structures.
2. Enforce compliance with contract documents including the plans and specifications. Confers with contractor regarding compliance with plans, quality of work, construction activity and CAL-OSHA regulations
3. Review and approve shoring plans, concrete mix designs, cidh pile placement plan b slurry displacement method, shop drawings for overhead sign structure, field welding procedures for Nelson studs, and all submittals provided by the contractor as required by the contract documents.
4. Prepare or assist the resident engineer in preparing ontract change orders (CCO), expands on CCOs, for the purpose of making alterations, deviations, additions to or deletions from the plans and specifications to ensure proper completion of the project.
5. Prepare responses to contractors claim issues. Prepare reports and letters as necessary to address construction and project issues.
6. Complete and maintain the necessary records pertaining to construction progress including daily reports, monthly newsletters, monthly pay estimates and job expenditures.

\

************************************************************************************

Rice-101 Project, Oxnard, CA

$35 million – Aug 2011 to May 2012

Project Description: The project consists of 1 new bridge with 3 NB and 3 SB lanes with a sidewalk in each direction (Rice Av. overcrossing the 101). Work is performed  over live traffic. There are 5 on/off ramps to be built.

Job Title: Structure Inspector

Responsibilities include: Provided grades and control for the contractor as called out in the specifications; inspected for QC and QA for structural items; made daily diaries for documentation and certified payroll.

**********************************************************************************

Ventura County Bridge Maintenance, Ventura, CA

$2 million – Aug 2014 to Apr 2015

Project Description : This project costs $2 million. It consists the construction of methacrylate overlay, new approach slabs using rapid strength concrete, new installation of Joint seal, and repair for bridge deck drainage system and miscellaneous bridge metal items.

Job Title: Structure Representative

Responsibilities include:

1.Reviewed and approved all the Contractor’s submittals: concrete mix design, joint seal, rapid strength concrete, jobsite inspection of the materials supplied.

2.Performed bridge engineering inspection/field testing/office work for construction of the followings to comply to the Special Provisions, Contract Plans, Standard Specifications, and Standard Plans:

3. Inspected methacrylate overlay

4. Inspected new approach slabs constructed by rapid strength concrete

5. Inspected Joint seal installation

6.Prepared monthly payment quantities and contract change orders

7. Enforced project quality assurance and safety regulations

8.Reviewed construction methods and schedules

9. Reviewed CTM testing for rapid strength concrete submittals

10.Maintained project documentation.

11. Resolved Contractor’s claims.

12. Responded to contractor’s  request for information.

****************************************************************************

Route 5 HOV Widening Burbank, CA

$55 million – 2013

Project Description : The project consists of 6 bridge widenings, 1430 m of retaining walls and soundwalls and 32 overhead sign structures.

Job Title: Assistant Structure Representative

Responsibilities include:
1. Inspection of soundwall, CIDH piles and concrete bent caps.
2. Calculation and checking field grades
3. Reviewing submittals

****************************************************************************

Route 5 HOV Widening Glendale, CA

$55 million – 2013

Project Description: : The project consists of 8 bridge widenings, 483 m of retaining walls and Soundwalls and 19 overhead sign structures.

Job Title: Assistant Structure Representative

Responsibilities include: Inspection of driving of steel pipe piles and concrete pour for footing and columns

******************************************************************************

Napa-Solano Bridge Rehabilitation Project, CA

$2 million – 2012

Project Description : This project costs $2 million. It consists the construction of methacrylate/polyester concrete overlay, new approach slabs using rapid strength concrete, full bridge deck repair, new installation of Joint seal type A & B.

Job Title: Assistant Structure Representative

Responsibilities include:

1. Reviewed the Contractor’s submittals: concrete mix design, joint seal type A and B, rapid strength concrete.

2. Reviewed and approved the suspended falsework design for full bridge deck repair.

3.Performed bridge engineering inspection/field testing for construction of the followings to comply to the Special Provisions, Contract Plans, Standard Specifications, and Standard Plans:

4.Inspected Polyester concrete / Methacrylate overlay

5. Ran and analyzed Bridge profilograph

6.Inspected new approach slabs constructed by rapid strength concrete

7. Inspected Joint seal type A, and B installation

8.Jobsite inspection of the materials supplied

9.Prepared monthly payment quantities

10. For Route 12 widening project 04-264134, inspected soil excavation for the Retaining Wall on Route 12 to follow OHSA & Caltrans safety regulations, and construction of a 10 ft by 6ft by 37 ft Reinforced Concrete Box culverts, Headwall, Wingwall, and 10 ft H x 369 ft L Retaining Walls.